We have been working hard on our house and it is coming along quite well. Ryan finished the plumbing and electrical. The HVAC guys came and put the furnace in on May 5th and our fireplace was installed on May 8th.

This is our fireplace.
We have three bird nests in our window and hope that we could get the windows in before the bird laid her eggs.... well come to find out the bird had laid her eggs a day or two later. Ryan found this out by getting to close to the nest and the mama bird started squawking. we later found out that the mama bird abandoned the eggs. This is a picture of the eggs before we put them outside to see if the mama bird would come back.

We installed our windows and doors on May 17th and had our 4 way inspection on May 22nd their was a couple things we had to get done before we can have the insulation people come.

This is our front door. We are going to stain it walnut to match out cabinets.

This is the front of our house with the windows and door installed.
Ryan worked his little tush off so the insulators will be there on Tuesday. The insulators should be done in one day and the sheetrockers will be there on Wednesday. Ryan told me we need to start looking at colors and flooring because it is about three weeks away from when we need it.
3 comments:
Wow! It's going up fast! Looks good.
What happened with the eggs? Did the mama bird ever come back?
No, I think that Ryan scared the mama bird when he got to close to the nest.
Post a Comment